HPCA Workflow
SkillCommunicationUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.
Use HPCA Workflow in Claude, ChatGPT or Ahel Desktop
Free. Sign in, add HPCA Workflow and connect your AI. About a minute.
Also: Claude Code · Cursor · Codex
Then ask your AI: use the HPCA Workflow skill
Details
Instructions available. Your AI can read the instructions. Execution depends on the setup they require.
Account requirements not reviewed. Check the skill instructions before use; ahel provides instructions and does not run this skill.
No other account needed.
Add ahel to your AI once: Claude, ChatGPT, Cursor, Claude Code or Codex. Then ask it to use this.
What this skill tells your AI
The instructions your AI receives, as published by brycewang-stanford/awesome-journal-skills in HPCA-Skills/skills/hpca-workflow/SKILL.md and read by ahel’s review.
Use this as the project-management skill for an HPCA submission. Replace every date with the current official timetable and plan backward from the late-July gate.
HPCA is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. It is run by the IEEE-CS Technical Committee on Computer Architecture (TCCA); the rotating leadership is the per-edition General and Program Chairs (HPCA 2027 program chairs were reported as Aamer Jaleel and Mattan Erez — 待核实), and the cost model is registration fees. Chairs rotate yearly, so re-check the current organization page rather than carrying a name forward.
The shape of the HPCA year
HPCA sits in the winter seat: a late-July deadline feeds an autumn review and a February/March conference. It is the last major architecture deadline of the summer, so a project that misses it waits for MICRO's spring gate or ISCA's November gate — plan the fallback before you need it.
Milestones
- Venue fit: confirm a measured microarchitectural cost meets a buildable mechanism whose behavior is the contribution.
- Evidence lock: freeze the mechanism, the simulator/silicon configuration, workloads, sampled regions, baselines, and the artifact mirror.
- Registration step: submit real title, abstract, authors, topics, and complete conflicts about a week before the paper.
- Paper step: upload the anonymous IEEE-template PDF and all HotCRP fields.
- Review wait: triage reviews for correctness, methodology, novelty, and reproducibility concerns as they land.
- Rebuttal/revision window: respond and revise in one combined window (recent cycles run a single window, not two rounds).
- Notification → acceptance: archive reviews, the response, and the submitted versions; then IEEE camera-ready, artifact evaluation on the AE HotCRP, and the winter talk.
Backward plan from the paper deadline
| Weeks out (heuristic) | Hardware-evaluated milestone |
|---|---|
| 8+ | Mechanism implemented; fidelity contract (tool, config, workloads) fixed |
| 6 | Baseline sweeps complete; per-workload results, not just means |
| 4 | Real-silicon or validated-simulator numbers logged with machine state |
| 3 | Full draft in the IEEE two-column template |
| 2 | Internal mock review by an architecture-minded reader |
| 1 | Reference author-list check, anonymity sweep, artifact mirror assembled |
| 0 | Registration then paper on HotCRP |
These offsets are planning heuristics — anchor every one to the current official timetable, never to a previous cycle.
Failure modes by stage
- Infrastructure still churning at week 4 forces last-minute configuration changes no one has validated — the classic HPCA methodology reject in the making.
- Leaving template conversion to the final week surfaces overflow late; two-column architecture figures are tighter than a working draft's.
- Skipping the mock review forfeits the only chance to hear "your baseline is under-tuned" from a friend rather than a reviewer.
- Building the artifact mirror after the deadline under pressure is how anonymity leaks and un-pinned simulators ship.
Coordination notes
- Assign one named owner for the fidelity contract and another for the anonymity sweep; shared ownership is how both slip.
- Archive the exact submitted PDF, the artifact mirror, and the configuration files, since rebuttal replies must quote them precisely.
Output format
[Current stage] idea / evaluation / writing / registration / paper / window / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <page/anonymity/instrument/reproducibility/artifact/presentation>
[Fallback venue] <MICRO / ISCA / ASPLOS branch if rejected>
[Owner map] <task -> person or role>
Signals
- GitHub stars
- 1k
- Forks
- 155
- Last commit
- Sep 2026
Advanced
- Item type
- skill
- Key
hpca-workflow- Source
- github.com/brycewang-stanford/awesome-journal-skills
github.com/brycewang-stanford/awesome-journal-skills
Related picks
Skill · yusufkaraaslan
The pick for PDFpdf-co-automation
Skill · composio-community
The pick for PDFslack-gif-creator
Skill · anthropics
More in Communicationerror-handling
Skill · affaan-m
More in Communicationemails
Skill · coreyhaines31
More in Communicationazure-messaging
Skill · microsoft
More in Communication