ICDM Workflow
SkillCommunicationUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.
Use ICDM Workflow in Claude, ChatGPT or Ahel Desktop
Free. Sign in, add ICDM Workflow and connect your AI. About a minute.
Also: Claude Code · Cursor · Codex
Then ask your AI: use the ICDM Workflow skill
Details
Instructions available. Your AI can read the instructions. Execution depends on the setup they require.
Account requirements not reviewed. Check the skill instructions before use; ahel provides instructions and does not run this skill.
No other account needed.
Add ahel to your AI once: Claude, ChatGPT, Cursor, Claude Code or Codex. Then ask it to use this.
What this skill tells your AI
The instructions your AI receives, as published by brycewang-stanford/awesome-journal-skills in ICDM-Skills/skills/icdm-workflow/SKILL.md and read by ahel’s review.
Use this as the project-management skill for an ICDM submission. ICDM runs a single annual deadline, so the plan is a one-shot sprint to June and then a long wait, not a KDD-style cycle loop. Replace every date with the current edition's official timetable and work backwards from the paper deadline.
ICDM is an IEEE conference, not a journal: there is no standing editor-in-chief and no article-processing charge. The rotating analogue is the per-edition General Chairs and Program (PC) Co-Chairs, appointed anew each year (2026 chairs 待核实 on the committee page); the cost model is registration, and at least one author must present in person for the paper to appear in the IEEE proceedings.
Milestones (2026 anchors — verify live)
- Venue + track fit: confirm Research vs Applied vs Blue Sky (see
icdm-topic-selection). - Evidence lock: freeze the mining task, mechanism, baselines, ablations, and scaling runs.
- Abstract deadline (2026-05-30): register real title, abstract, authors, topics.
- Full-paper deadline (2026-06-06, AoE): upload the anonymized 10-page PDF (Research).
- The summer wait: reviews proceed triple-blind with, traditionally, no rebuttal.
- Notification (2026-08-16): Accept / Accept-as-Short / Reject.
- Camera-ready: IEEE eCopyright, de-anonymization, in-person registration.
- Conference (Nov 12-15, Shenyang): present; the paper enters IEEE Xplore.
Backward plan from the June paper deadline
| Weeks out (heuristic) | Data-mining-methods milestone |
|---|---|
| 8+ | Mechanism fixed; mining task and baselines chosen |
| 6 | Ablations designed to isolate the mechanism |
| 4 | Scalability runs complete, seeds logged |
| 3 | Full draft compiled in IEEE two-column, measured against the 10-page all-inclusive cap |
| 2 | Internal mock review by a data-mining-minded reader |
| 1 | Triple-blind sweep, anonymized artifact export, appendix trimmed inside the cap |
| 0 | Abstract, then full paper on the submission system before AoE |
These offsets are heuristics — anchor every one to the current official timetable, never a prior edition's calendar.
The two ICDM-specific branches
- No-rebuttal posture. Plan as if you will get no chance to reply after reviews. That
means the submitted PDF and its cited anonymized repository must pre-answer the obvious
reviewer questions. If the current edition does open a response window, treat it as a
bonus, not the plan (see
icdm-author-response). - Short-paper branch. Acceptance may arrive as "accepted as a short paper." Keep a
compression plan ready: which sections collapse, which results move to the repository,
and how the contribution survives at short-paper length (see
icdm-camera-ready).
Failure modes by stage
- Treating the appendix as free space and discovering at week 1 that references plus appendix push the PDF past 10 pages — a no-review reject born of planning, not science.
- Building the anonymized artifact after the deadline, under time pressure, is how a triple-blind identity leak ships.
- Assuming a rebuttal exists and leaving a known weakness "for the response" that never comes.
- Forgetting the in-person presentation requirement until camera-ready, when travel and registration logistics are hardest.
Coordination notes
- Assign one owner for the triple-blind sweep and another for the 10-page arithmetic; shared ownership is how both slip.
- Archive the exact submitted PDF and anonymized repository; if a response window opens, replies must quote them precisely.
- Diarize the August notification date so the short-paper branch can start immediately.
Output format
[Current stage] fit / experiments / writing / abstract / submission / waiting / decision / camera-ready
[Track] Research / Applied / Blue Sky
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <10-page cap / anonymity / scale evidence / no-rebuttal exposure / presentation>
[Branch readiness] short-paper compression plan: ready / not ready
Signals
- GitHub stars
- 1k
- Forks
- 155
- Last commit
- Sep 2026
Advanced
- Item type
- skill
- Key
icdm-workflow- Source
- github.com/brycewang-stanford/awesome-journal-skills
github.com/brycewang-stanford/awesome-journal-skills
Related picks
Skill · yusufkaraaslan
The pick for PDFpdf-co-automation
Skill · composio-community
The pick for PDFacademic-paper-composer
Skill · brycewang-stanford
The pick for Academic03-academic-writing
Skill · 24kchengye
The pick for Academicslack-gif-creator
Skill · anthropics
More in Communicationerror-handling
Skill · affaan-m
More in Communication