Production Readiness

SkillFiles & storage

Monitoring, observability, operational procedures, CI/CD lessons learned, and quality gate definitions. Load when assessing production readiness or validating operational excellence.

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the Production Readiness skill

What this skill tells your AI

The instructions your AI receives, as published by nwave-ai/nwave in nWave/skills/nw-production-readiness/SKILL.md and read by ahel’s review.

Monitoring and Observability

Application Monitoring

  • Performance: response time | throughput | latency percentiles (P50, P95, P99)
  • Resources: CPU | memory | database connections | cache hit rates
  • Errors: exception tracking | error rate trends | integration failure detection
  • Business: KPI tracking | conversion funnels | feature usage | revenue impact

Infrastructure Monitoring

Server/container health and resource utilization | Network performance and connectivity | Storage capacity and I/O performance | Security event detection.

Alerting Tiers

TierConditionResponse
PageService down, data loss risk, security breachImmediate response
UrgentError rate >2x baseline, latency SLA breachResponse within 15 min
WarningCapacity >80%, error rate trending upResponse within 1 hour
InfoDeployment complete, metric threshold crossedReview next business day

Operational Procedures

Incident Response

  1. Detect: automated alerting identifies issue
  2. Triage: classify severity, assign responder
  3. Communicate: notify stakeholders per severity level
  4. Resolve: apply fix or rollback
  5. Review: post-incident review within 48 hours
  6. Improve: update runbooks and monitoring based on findings

Maintenance Procedures

Regular update and patching schedule | Backup verification (test restores quarterly) | Security vulnerability scanning (automated, weekly) | Performance baseline recalibration (after major changes).

Knowledge Transfer

Operational runbooks for common procedures | Architecture documentation with system diagrams | Deployment procedures and configuration management | Troubleshooting guides for known failure modes.

Quality Gates for Production Readiness

Before declaring production-ready, all must pass:

  • All acceptance tests passing
  • Unit coverage meets project standard (default: >= 80%)
  • Integration tests validated
  • Performance validated under realistic load
  • Security scan completed (0 critical, 0 high)
  • Monitoring and alerting configured
  • Logging structured and searchable
  • Rollback procedure documented and tested
  • Runbook created for operational procedures
  • On-call team trained on new feature

For CI/CD architecture lessons and measurement coupling pitfalls, see cicd-and-deployment skill.

Signals

GitHub stars
610
Forks
64
Last commit
Sep 2026
Advanced
Catalog kind
skill
Gateway key
nw-production-readiness
Source
github.com/nwave-ai/nwave