plan-phase

SkillDev tools

Create detailed phase plan (PLAN.md) with verification loop

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the plan-phase skill

What this skill tells your AI

The instructions your AI receives, as published by buildomator/buildomator in skills/plan-phase/SKILL.md and read by ahel’s review.

Default flow: Research (if needed) → Plan → Verify → Done

Orchestrator role: Parse arguments, validate phase, research domain (unless skipped), spawn gsd-planner, verify with gsd-plan-checker, iterate until pass or max iterations, present results.

<execution_context> @${CLAUDE_PLUGIN_ROOT}/workflows/plan-phase.md @${CLAUDE_PLUGIN_ROOT}/references/ui-brand.md </execution_context>

Flags:

  • --research — Force re-research even if RESEARCH.md exists
  • --skip-research — Skip research, go straight to planning
  • --gaps — Gap closure mode (reads VERIFICATION.md, skips research)
  • --skip-verify — Skip verification loop
  • --prd <file> — Use a PRD/acceptance criteria file instead of discuss-phase. Parses requirements into CONTEXT.md automatically. Skips discuss-phase entirely.
  • --reviews — Replan incorporating cross-AI review feedback from REVIEWS.md (produced by /gsd:review)
  • --text — Use plain-text numbered lists instead of TUI menus (required for /rc remote sessions)

Normalize phase input in step 2 before any directory lookups.

<output_format> When planning concludes (PLAN.md files written, plan-checker passed, STATE.md updated), emit a Next Up continuation block following the pattern in references/continuation-format.md:

  • Show planning status (e.g., ## ✓ Phase N Planned — M plans, K tasks with brief plan list)
  • Emit a ## ▶ Next Up heading with /gsd:execute-phase N
  • Use `/clear` then: before the command
  • Include a parenthetical: (/clear is safe — /gsd:resume-work restores position from HANDOFF.json if you change your mind)
  • Add an "Also available:" section: review the plan files, run /gsd:list-phase-assumptions N, etc.

Plan-to-execute is a clean boundary; /clear keeps execution starting with a tight, plan-focused context. </output_format>

Signals

GitHub stars
88
Forks
12
Last commit
Sep 2026
Advanced
Catalog kind
skill
Gateway key
plan-phase
Source
github.com/buildomator/buildomator